Notes:

The new tower opened May 3, 2011, high 53 meters, consists of 13 floors, which are distributed in the different rooms: the two main halls of the tower (Twr) and approach (App-approach), more room for back-up , simulation and training rooms and spaces with technical equipment and rest. The total investment of ENAV was 35 million. The airport has been equipped with advanced technologies and systems that allow it to be among the most advanced airports in the world. The workstations are equipped with the most advanced technology available, with the aim of carrying out air traffic services at the highest levels of security: surface radar, approach radar, aeronautical information interface, remote control and monitoring system, visual aid lighting systems automated weather frequencies and / multif phones operating system.

Photographer

Contact photographer for terms of use.

Registration

LIPZ

Photo Date

Oct 23, 2011

Uploaded

Nov 18, 2011

Views

4,522

Likes

1

Badges

None

Notes

The new tower opened May 3, 2011, high 53 meters, consists of 13 floors, which are distributed in the different rooms: the two main halls of the tower (Twr) and approach (App-approach), more room for back-up , simulation and training rooms and spaces with technical equipment and rest. The total investment of ENAV was 35 million. The airport has been equipped with advanced technologies and systems that allow it to be among the most advanced airports in the world. The workstations are equipped with the most advanced technology available, with the aim of carrying out air traffic services at the highest levels of security: surface radar, approach radar, aeronautical information interface, remote control and monitoring system, visual aid lighting systems automated weather frequencies and / multif phones operating system.

Camera

CANON EOS 400-D | SIGMA AF 17-70 f.2/8 DC MACRO Show Exif data
Contact photographer for terms of use.

Comments

No comments